Installation Guidelines
To ensure the best performance, follow the instructions below during installation.
1. Site Preparation
- Ensure the wall surface is level and clean.
- Provide safe workspace and electricity for tools.
2. Measurement & Manufacturing
Final manufacturing is based on measurements taken by our trained technicians. Do not modify openings after measurement approval.
3. During Installation
- Keep children & pets away from the work area.
- Do not operate doors/windows for 6–12 hours after silicone sealing.