Installation Guidelines

To ensure the best performance, follow the instructions below during installation.

1. Site Preparation

  • Ensure the wall surface is level and clean.
  • Provide safe workspace and electricity for tools.

2. Measurement & Manufacturing

Final manufacturing is based on measurements taken by our trained technicians. Do not modify openings after measurement approval.

3. During Installation

  • Keep children & pets away from the work area.
  • Do not operate doors/windows for 6–12 hours after silicone sealing.
scroll to top